# What is a non-conformance report?

Source: https://cloudbrain.in/glossary/non-conformance-report
Last updated: 2026-11-22

A non-conformance report (NCR) is a quality record raised when construction work, materials or documents do not meet the specification or drawings, describing the problem, the corrective action and its close-out. NCRs show whether a project's quality system works. Audits check that NCRs are raised, corrected and closed, and look for repeated problems that point to a systemic issue.

## Why does non-conformance report matter in a construction project audit?

NCRs show whether a project's quality system works. Audits check that NCRs are raised, corrected and closed, and look for repeated problems that point to a systemic issue.

## What is an example?

An NCR records that concrete cover to the reinforcement in a beam is less than specified, the decision to add a protective coating after the designer's approval, and the date it was closed.

## Where does CloudBrain come in?