Skip to content

AEC news · United Kingdom · PBC Today

What a SuDS maintenance plan should establish at handover

Excerpt from PBC Today

Sustainable drainage continues to depend on inspection, access and responsible management after construction. A useful handover makes those requirements clear for the people who will operate the assets A sustainable drainage system is handed over as a set of physical assets that must keep performing in a changing environment. Inlets can become obstructed, vegetation develops, sediment accumulates and adjacent land use can change. The maintenance plan needs to explain how those conditions will be observed and managed. The practical question is whether the receiving organisation can identify the assets, understand their function and carry out the required work. A generic schedule without locations, access arrangements or responsibility leaves that question unanswered. Explain what the system is intended to do The handover should connect drawings and asset records with an accessible account of the drainage design.

Published by PBC Today ·

Read the full article on PBC Today (opens in a new tab)
Image: PBC Today

Image: PBC Today, shown from the publisher’s website.

Is your project on track?

CloudBrain Project Audit carries out independent audits of design, quality, documentation and billing on construction projects worldwide, before, during and after construction.

CloudBrain Project AuditIndependent technical and commercial audits of construction projects.

Countries and topics

The headline and excerpt are from PBC Today, which owns them; CloudBrain is not affiliated with PBC Today. Read the original article (opens in a new tab) · All AEC news

Talk through your AI plans with our team

Book a strategy call. We'll look at where AI can save your team time, what it will take, and what to leave alone.