What do we check on commercial projects?
- Design and coordination: architectural, structural and services design against the brief and the codes that apply, and coordination between packages.
- Facades: design and shop drawings, test and inspection records, and installation quality.
- Building services: HVAC, electrical, fire, plumbing and vertical transport, from design to testing and commissioning.
- Fit-out and tenant interfaces: fit-out designs and works against the base building, services capacity and the landlord's rules.
- Billing across packages: each contractor's bills against its contract and measurements, with overlaps and gaps between packages.
- Documentation: drawing registers, approvals, RFIs, variations and handover documents.
| Project types | Offices and business parks, retail and malls, showrooms, mixed commercial buildings |
|---|---|
| Typical focus | Facades, building services, fit-out packages and tenant interfaces, multiple contracts and billing |
| Stages | Pre-construction, construction and post-construction, one stage or all of them |
| Delivery | Document review remotely, with site inspections in India directly and elsewhere by arrangement |

What are the key risks at each stage?
| Stage | Typical risks on commercial projects |
|---|---|
| Pre-construction | Gaps and overlaps between civil, facade, services and fit-out packages; facade performance not specified |
| Construction | Facade installation tolerances; services coordination in ceilings; bills across several contractors overlapping |
| Post-construction | Tenant fit-out changes not reflected in as-builts; services commissioning incomplete for some floors |
Which codes and standards do we check against?
For projects in India, we check against the codes and standards that apply, such as the National Building Code of India 2016 (including Part 4 on fire and life safety), IS 456 for concrete, IS 800 for steel, IS 875 for design loads and IS 1893 for earthquake resistance, along with local building bye-laws. Outside India, we check against the codes and standards that apply where the project is. For commercial buildings we also check facade specifications and test requirements, and building services against the design basis.

What does a typical finding look like?
These are illustrative examples, not from a real project.
Ceiling works appear in both the fit-out and the MEP package scopes
- Evidence
- Scope sections of both contracts
- Recommendation
- Assign the work to one package and adjust the other before award
Facade glass units installed without the specified test reports on file
- Evidence
- Facade QA records compared with the specification
- Recommendation
- Obtain the test reports, or test samples, before further installation
Two contractors billed for the same shaft enclosure works
- Evidence
- Bills of both packages compared with site inspection
- Recommendation
- Recover the duplicate payment and define the interface
Which stage should you audit?
Before tender or contract award to fix gaps cheaply, during construction to control quality, progress and payments across packages, and at completion to check handover documents and the final accounts. See the pre-construction, construction and post-construction audits.
Frequently asked questions
What is different about auditing a commercial building?
- Commercial buildings usually have several contract packages, such as civil, facade, services and fit-out, so interfaces, coordination and billing across packages need close checking, along with facade and services quality.
Do you audit tenant fit-outs?
- Yes. We check fit-out designs and works against the building's base design, services capacity, fire safety and the landlord's fit-out rules.
Can you audit billing across several contractors?
- Yes. We check each package's bills against its contract and measurements, and look for overlaps or gaps between packages.
Do you check facades?
- We review facade design and shop drawings, test and inspection records, and installation on site. Facade testing is arranged with specialist labs or partners where needed.