CloudBrain Project Audit
Construction project audits, worldwide
This is an independent technical and commercial project audit. It is not a statutory financial audit, which in India is carried out by chartered accountants.
Audits at every stage of a project
- Pre-construction auditDesign, estimate, tender, contract and approvals checked before work starts.What we check
- Construction stage auditQuality, progress, running bills, variations and site records during the works.What we check
- Post-construction auditAs-builts, snags, commissioning, O&M manuals and the final account at handover.What we check
What a project audit covers
- DesignDrawings checked against the brief and the codes and standards that apply where the project is; coordination between disciplines and constructability.
- QualityQA/QC plans, material test records, inspection and test plans, and workmanship on site.
- DocumentationDrawing registers, approvals, RFIs, change orders, site records, minutes and as-built drawings.
- Billing and costMeasured quantities against the BOQ, rates against the contract, variations, escalation, retention and the final account.
- Schedule and progressActual progress against the programme, delays and their causes, and the recovery plan.
- Contracts and claimsContract terms, variation and claim procedures, notices and records that support or weaken a claim.
- Statutory approvalsBuilding permissions, fire, environmental and other approvals, and the conditions attached to them.
- Health, safety and environmentSite safety plans, permits to work, incident records and environmental controls.
- Handover and O&MTesting and commissioning records, snag lists, warranties, O&M manuals and defects liability.
Project types we audit
- Industrial projectsFactories, warehouses and plants: structure, services, fire safety and approvals.What we check
- Commercial projectsOffices, retail and malls: facades, services, fit-out and multiple contracts.What we check
- Group housing projectsTowers and townships: repeated quality checks, unit snagging and stage billing.What we check
- Institutional and other projectsHospitals, education, hospitality, mixed use and other building types.What we check
Who carries out the audit, and where
A dedicated audit team
- Architects
- Structural and MEP engineers
- Quantity surveyors
- QA/QC specialists
Projects worldwide
Design, documentation and billing audits are carried out remotely from shared project documents, for projects anywhere. Site inspections are made directly in India and by arrangement elsewhere, through travel or a local partner agreed for each project.
Independent
The audit team reports to whoever commissions the audit, and records every finding with its evidence. This is an independent technical and commercial project audit. It is not a statutory financial audit, which in India is carried out by chartered accountants.
How a project audit works
- Enquiry and conflict check
- Scope and engagement letter
- Document request list
- Desk review
- Site inspection
- Findings and severity rating
- Draft report and factual check
- Final report and walkthrough
- Follow-up and close-out
The full method: inputs, outputs and who does what at each step →
How are findings rated?
| Severity | What it means | Expected action |
|---|---|---|
| Critical | A risk to safety, structural integrity or legal compliance, or a major financial exposure. | Act immediately; stop or hold the related work or payment. |
| High | A significant cost, time or quality risk if it is not corrected. | Correct before the next milestone or payment. |
| Medium | A departure from the contract, specification or good practice with a moderate impact. | Correct within an agreed period. |
| Low | A minor gap in records or process with little direct impact. | Correct during normal work. |
| Observation | Not a defect: a suggestion to improve control, records or efficiency. | Consider; no action required. |
See how we work in detail
- How we auditOur audit method: principles, the nine-step SOP, severity ratings and evidence.Read more
- Sample audit reportWhat an audit report contains, with an illustrative findings register.Read more
- Audit checklistsWhat we check at each stage: design, quality, billing, records and handover.Read more
Frequently asked questions
What is a construction project audit?
- An independent review of a construction project that checks its design, quality, documentation, billing, schedule, contracts and compliance against the brief, the contract and the codes that apply, and reports findings with recommended actions.
Is this a financial audit?
- No. It is an independent technical and commercial project audit. It is not a statutory financial audit, which in India is carried out by chartered accountants.
Who commissions a project audit?
- Developers and owners checking their consultants and contractors, lenders and investors checking progress before releasing funds, contractors checking their own records before a claim, and owners at handover.
Do you audit projects outside India?
- Yes. Design, documentation and billing audits are carried out remotely from shared project documents, for projects anywhere. Site inspections are made directly in India and by arrangement elsewhere, through travel or a local partner agreed for each project.
Who carries out the audit?
- A dedicated audit team of architects, structural and MEP engineers, quantity surveyors and QA/QC specialists. The team for each audit depends on the project type and the areas in scope.
How does AI fit into CloudBrain Project Audit?
- CloudBrain is an AI-enabled consulting company. The audit team uses software, including AI, to organise and compare drawings, documents and bills, but every finding is checked and signed off by a qualified person.
What do we receive at the end of an audit?
- A written report with an executive summary, scope and limitations, method, a findings register with severity ratings and recommended actions, the project team's responses, and appendices such as a photo log. We then walk your team through the findings.
How are findings rated?
- On a five-level scale: Critical, High, Medium, Low and Observation. Critical findings, such as a safety risk, are reported straight away rather than waiting for the report.
How long does an audit take?
- Typically 2–4 weeks for a pre-construction or post-construction audit, and 3–6 weeks for a single construction-stage audit, or monthly or milestone visits for the life of the project. The exact timeline depends on the areas in scope, the size of the project, how organised the documents are and whether site visits are needed, and is agreed in the engagement letter.
Can we see a sample report?
- Yes. The sample report page shows what a CloudBrain Project Audit report contains, with an illustrative findings register. It is an example, not a real project.
Find out where your project stands
Tell us about the project, its stage and what worries you most. We'll propose an audit scope, the documents we need and whether site visits are required.