Construction project audit checklists
These checklists show what a CloudBrain project audit checks at each stage of a construction project: design, cost and contracts before work starts; quality, billing, progress and records during construction; and handover documents and the final account at the end. Each stage also lists the documents we ask for.
Download the full checklist
The complete checklist as a free 16-page A4 PDF: every check for each stage with Yes, No and N/A boxes, a severity scale, document request lists and a blank findings register.

Construction Project Audit Checklist
PDF · 16 pages · A4
First edition · November 2026
Pre-construction audit
What do we check before construction starts?
- Design and tender
- Construction
- Handover
- Defects liability period
Design
- Drawings meet the brief: areas, functions and specifications
- Design complies with the codes and approvals that apply (for example NBC 2016, or local codes)
- Architectural, structural and MEP drawings are coordinated, with no clashes at key junctions
- Details are buildable with the materials and methods specified
Cost and BOQ
- BOQ quantities for major items match the drawings
- No missing, duplicated or vague items; provisional sums are justified
- Item descriptions match the specifications
Contracts and approvals
- Scope, interfaces and responsibilities are clear between packages
- Payment, variation, escalation and retention terms are workable
- Required approvals are in hand, or planned in the programme
Documents we ask for
- Client brief and design basis report
- Architectural, structural and MEP drawings with their revision register
- Specifications and the BOQ with the cost estimate
- Tender documents, draft contract and conditions of contract
- Approvals obtained and pending, with their conditions
- Programme and the project risk register
Construction stage audit
What do we check during construction?
- Design and tender
- Construction
- Handover
- Defects liability period
Quality
- Inspection and test plan exists and is followed for each activity
- Material test certificates match the materials and batches used
- Workmanship inspected on site matches the drawings and specifications
- Non-conformances are recorded, corrected and closed
Billing
- Billed quantities match measurements and approved drawings
- Rates match the contract; non-tender items are approved
- Advances, recoveries, deductions and retention are applied correctly
Progress, records and safety
- Progress matches the programme; delays have causes and a recovery plan
- Drawings on site are the current revision
- Safety plan, permits to work and incident records are in place
Documents we ask for
- Contract, approved drawings and current revision register
- QA/QC plan, inspection and test plans, material test certificates
- Running account bills with the measurement book or measurement sheets
- Variation and change-order register with approvals
- Programme, progress reports and minutes of meetings
- Site diary, RFI register, non-conformance reports and safety records
Post-construction audit
What do we check at completion and handover?
- Design and tender
- Construction
- Handover
- Defects liability period
Handover
- As-built drawings reflect the built works for every discipline
- Snag list is complete, with owners and close-out dates
- Testing and commissioning is complete for every system
Documents
- O&M manuals, warranties and the asset register are complete and usable
- Statutory completion and occupancy approvals are in hand
Final account
- Final quantities reconcile with measurements and earlier bills
- Every variation in the final account is approved and priced per contract
- Retention and guarantees are tracked to the end of the defects liability period
Documents we ask for
- As-built drawings for every discipline
- Snag and defect lists with close-out status
- Testing and commissioning records and certificates
- O&M manuals, warranties and the asset register
- Final bill, final account statement and earlier running bills
- Retention, bank guarantee and defects liability period details
How are the checks applied?
Checklists set the minimum. The audit team adapts them to the project type and the concerns in the scope, samples large registers and bills, and rates every finding for severity. See how we audit and a sample report.
This is an independent technical and commercial project audit. It is not a statutory financial audit, which in India is carried out by chartered accountants.
Request a project auditFind out where your project stands
Tell us about the project, its stage and what worries you most. We'll propose an audit scope, the documents we need and whether site visits are required.