What a project audit report contains

A CloudBrain project audit report opens with an executive summary for decision makers, then sets out the scope and its limits, the method and samples, and a findings register. Each finding records its evidence, severity, impact, recommended action and status. The example below is illustrative, not a real project.

What does every report contain?

  1. Section 1

    Executive summary

    The overall position, the critical and high findings, and the decisions needed.

  2. Section 2

    Scope and limitations

    Stage, audit areas, samples, site visits, and what was not covered.

  3. Section 3

    Method

    Documents reviewed, sampling approach, inspection dates and the severity scale.

  4. Section 4

    Findings register

    Every finding with its evidence, severity, impact, recommendation and status.

  5. Section 5

    Management responses

    The project team's response to each finding after the factual check.

  6. Section 6

    Appendices

    Photo log, measurement sheets, document index and sample selections.

What does a findings register look like?

An illustrative construction-stage audit of a mixed-use building: the executive summary and the findings register.

Illustrative example, not a real project. The project, findings and references below are made up to show the format of a CloudBrain Project Audit report. They do not describe any real project, client or contractor.

Illustrative report · Executive summary

Construction-stage audit, mixed-use building (illustrative)

The audit covered design coordination, quality records, two sampled running bills, documentation, approvals, site safety and handover readiness. Ten findings are reported. One critical safety finding was reported and closed on the day of the site inspection; four high findings need action before the next payment.

  • Critical 1
  • High 4
  • Medium 4
  • Low 0
  • Observation 1
Findings register (illustrative example, not a real project)
IDAreaSeverityFinding and evidenceRecommendationStatus
F-01DesignHighStair width on the second escape stair is below the minimum for the occupant loadEvidence: Architectural drawing A-201, revision C, compared with the fire and life safety requirements that applyImpact: Risk to fire approval and occupant safety; redesign cost rises after construction startsRevise the stair design and confirm with the fire consultant before tenderOpen
F-02DesignMediumMain HVAC duct clashes with a beam at level 3, grid C–DEvidence: Overlay of structural drawing S-310 and HVAC drawing M-305Impact: Site rework and loss of ceiling height if not resolvedCoordinate a revised duct route; issue a coordinated drawingOpen
F-03QualityHighCube test results missing for two slab poursEvidence: Pour register compared with the concrete test register for the sampled monthImpact: Concrete strength for those slabs cannot be demonstratedLocate the records or commission in-situ testing; hold related paymentsOpen
F-04BillingHighRunning bill claims the full slab area; the drawing shows a 12 m² opening not deductedEvidence: Measurement sheet for the sampled bill compared with structural drawing S-402Impact: Overpayment if the item is not correctedRe-measure and correct the quantity in the next billOpen
F-05BillingMediumNon-tender item paid at a rate that was not approvedEvidence: Bill extract and the variation register; no rate approval on fileImpact: Payment without contractual basisObtain rate analysis and approval, or recover the differenceOpen
F-06DocumentationMediumSuperseded drawing revisions in use on site for one blockEvidence: Site inspection compared with the drawing register (photo log, item 14)Impact: Risk of work built to an outdated designWithdraw superseded drawings; set up a controlled drawing issue processOpen
F-07ApprovalsHighA condition of the environmental clearance has no compliance recordEvidence: Approval conditions compared with the compliance fileImpact: Regulatory risk at completion and occupancyAssign an owner and record compliance before the next stageOpen
F-08Health, safety and environmentCriticalEdge protection missing at an open slab edge on an upper floorEvidence: Site inspection, photo log item 22Impact: Immediate risk of a fall from heightStop work in the area until edge protection is installed and checkedClosed on the day
F-09HandoverMediumNo commissioning records for the fire pump setEvidence: Commissioning file compared with the systems listImpact: Fire system performance cannot be demonstrated at handoverCommission and record before accepting handoverOpen
F-10Contracts and claimsObservationDelay notices are filed, but not linked to the programme updatesEvidence: Correspondence file and programme revisionsImpact: Weakens the record if an extension of time is disputed laterLink each notice to the programme activity it affectsNoted

What do the severity ratings mean?

Finding severity scale
SeverityWhat it meansExpected action
CriticalA risk to safety, structural integrity or legal compliance, or a major financial exposure.Act immediately; stop or hold the related work or payment.
HighA significant cost, time or quality risk if it is not corrected.Correct before the next milestone or payment.
MediumA departure from the contract, specification or good practice with a moderate impact.Correct within an agreed period.
LowA minor gap in records or process with little direct impact.Correct during normal work.
ObservationNot a defect: a suggestion to improve control, records or efficiency.Consider; no action required.

This is an independent technical and commercial project audit. It is not a statutory financial audit, which in India is carried out by chartered accountants.

Want a report like this for your project?

Tell us about the project, its stage and what worries you most. We'll propose an audit scope, the documents we need and whether site visits are required.