Why does measurement book matter in a construction project audit?
Every quantity in a bill should trace back to the measurement book. Missing signatures, measurements without locations or quantities that exceed the drawings are typical audit findings.
What is an example?
An MB entry records plaster to the internal walls of flat 1203 as 2 walls of 4.2 m by 3.0 m, less one door opening, with the date and both signatures.
Where does CloudBrain come in?
CloudBrain Project Audit checks this as part of the construction stage audit. See our audit checklists, or browse the full glossary.
