Why does testing and commissioning matter in a construction project audit?
Systems that are not properly commissioned cause failures after occupation. Audits check that every system has test and commissioning records, certificates and trained operators before handover is accepted.
What is an example?
Commissioning a fire pump set includes running each pump, recording pressures and flows against the design, testing automatic start and alarms, and signing the commissioning sheet.
Where does CloudBrain come in?